What Does site acceptance test and commissioning Mean?
Initiate the boot-up system for engineering and operator workstations as per the manufacturer’s Guidelines.Following the site has been cleaned and all fixtures are actually put in, an interior box stress and air flow Examine is done. This test is done to make sure that the Area is properly pressurized and There is certainly satisfactory air flow.